Timeline: 7 April 2024 – ongoing
Assigned Testing Laboratory: Grassform
Client: Lamda Development
Location: Elliniko, Greece
Projects
The Ellinikon Sports Park
Our services:
- Validation of construction specifications for 6 natural, hybrid and artificial pitches
- Key stage inspection including lab and field tests
- Material approval
- Handover assessment conforming to international protocols
AlphaΜega Stadium, Cyprus
Timeline: 7 June 2024 – 19 July 2024
Assigned Testing Laboratory: Grassform
Pitch Contractor: Grassmax – Easyturf
Location: Limassol, Cyprus
Specifications and Key Stage Inspection:
- Installation of stitched hybrid system
- New 4G artificial turf perimeter
- New maintenance equipment
Aris FC – Dasigeneio Training Centre
Timeline: 8 January 2024 – ongoing
Assigned Testing Laboratory: Grassform
Pitch Contractor: Markoudis Ltd and in-house team
Location: Thessaloniki, Greece
Specifications and Key Stage Inspection:
- Construction of 2 training pitches
- New drainage system
- New irrigation system
- New pitch profile formation
- Soil amelioration
- Warm-season turfgrass seeding
PAS Giannina FC – Anatoli Stadium, PEAKI Sports Centre
Timeline: 8 August – 28 December 2023
Assigned Testing Laboratory: Grassform
Pitch Contractor: Tsakogiannis S.A.
Location: Ioannina, Greece
Specifications and Key Stage Inspection:
- Construction of 2 training pitches
- New drainage system
- New irrigation system
- New pitch profile formation
- Soil amelioration
- Cool-season turfgrass seeding
Panathinaikos FC – ΟΑΚΑ
Timeline: 7 August – 29 August 2023
Assigned Testing Laboratory: Grassform
Pitch Contractor: Gennatos Turf
Location: Athens, Greece
Specifications and Key Stage Inspection:
- Full pitch reconstruction
- New drainage system
- New irrigation system
- New pitch profile formation
- Soil amelioration
- Installation of sand-based, warm-season turf surface
Aris FC – Kleanthis Vikelidis Stadium
Timeline: 7 June – 22 July 2021
Assigned Testing Laboratory: Grassform
Pitch Contractor: Hellasod S.A.
Location: Thessaloniki, Greece
Specifications and Key Stage Inspection:
- Thatch removal
- New pitch profile formation
- Soil amelioration
- Warm-season turfgrass seeding
AEK FC – OPAP Arena Stadium
Timeline: 29 May – 5 August 2022
Assigned Testing Laboratory: Grassform
Pitch Contractor: Hellasod S.A.
Location: Nea Philadelphia, Greece
Specifications and Key Stage Inspection:
- Construction of drainage system
- Construction of irrigation system
- Installation of artificial turf perimeter (Quality Pro)
- New pitch profile formation
- Soil amelioration
- Installation of warm-season washed turf
PAS Giannina FC – Zosimades Stadium
Timeline: 29 May – 5 August 2021
Assigned Testing Laboratory: Grassform
Pitch Contractor: Hellasod S.A.
Location: Ioannina, Greece
Specifications and Key Stage Inspection:
- Drainage system reconstruction
- Irrigation system reconstruction
- New pitch profile formation
- Soil amelioration
- Warm-season turfgrass seeding
Panathinaikos FC – Apostolos Nikolaidis Stadium
Timeline: 5 June – 16 August 2021
Assigned Testing Laboratory: Grassform
Pitch Contractor: Gennatos Turf
Location: Athens, Greece
Specifications and Key Stage Inspection:
- Full pitch resurfacing
- New drainage system construction
- New pitch profile formation
- Turfgrass establishment from sprigs (stolons) – first case in Greece
Panathinaikos FC – Apostolos Nikolaidis Stadium
Timeline: 29 November – 27 December 2020
Assigned Testing Laboratory: Grassform
Pitch Contractor: Gennatos Turf
Location: Athens, Greece
Specifications and Key Stage Inspection:
- Partial reconstruction of the drainage system
- Soil amelioration
- Installation of turf imported from Italy
Panetolikos FC – Georgios Gallos Stadium
Timeline: 18 May – 16 August 2019
Assigned Testing Laboratory: Grassform
Pitch Contractor: In-house team
Location: Agrinio, Greece
Specifications and Key Stage Inspection:
- Drainage system reconstruction
- Irrigation system reconstruction
- New pitch profile formation
- Soil amelioration
- New warm-season turfgrass